we put some more scaffolding up for the roofers to work on top. it is a required process by the nz safety. this is to ensure the people going up do not fall off the building. the house was given to them for two days to lay down the self sopporting under lay(bitumous paper) this is layed over all the purlins an strectched so it was straight over the purlin, making sure there are no sags.after that the congregated iron is put over top of the underlay and screwed . one over laping the over. the roofer also put up the fascias an gutter..
back onsite. we took down the scafolding and did abit of house keeping. the weather boards were sent so we could paint them with four coatings. the weather boards are painted on both sides. as this went on we used the building wrap to wrap the whole house. this is used for extra insulation and protection. the paper is stuck on with the staple gun it is pulled tight so it doesnt have any sags. blue strap also went on between the 1 above every nog spacing having a total of 3 at each stud with nogs between.
Tuesday, 5 July 2011
Tuesday, 21 June 2011
roof an ceiling batten summary
CAPTION:cross brace used to prevent movements at the ends |
metal braces are used to hold a tension between trusses to prevent movement. This is similar to wall bracing, block tensioners are used on the metal strip |
Add caption |
dogy wires are nailed into the stud an top plate. before nailing a gap is chiseled out so wen the wire goes in it does cause a lump when the covers go over the walls |
Tuesday, 7 June 2011
building summary factory ready walls,bracing,wall made on site,alligning the walls,scaffoling an trusses
wall butts up against double stud an packers to 100x0.4 galv nail Fh are shot in to hold it in place |
number of the wall each joint a nail plate was put in one every where around but double if a brace was on the wall |
wall is braced to the house to keep it from moving |
lintel supported by jack stud to hold the lintel. Triple stud is used because of the length of the lintel. Amount of studs change depending on the length of the lintel. |
wall is braced with the metal brace for strength.two nails go in the nogs and three in the studs |
double packers |
truck dropoped off all the walls and the material of the wall to be built,followed the plan the manufactures sent and stood each wall on the number that was shown in the specs.we set up string line all arounud after that was done an alligned all the walls up an nailed them into the floor board. we then did the same to the of the walls we used log braces of 90x45 an nailed tmen to the ground when the top of the frame was straighter. som nogs were removed from the factory made frames because they were makin the stud not straight,they wer cut for a better fit.
standard being connected to the legers with cuplings |
poles being shot 800 across |
walls the same thicknes as a normal tiber wall the npackers are needed, |
little srews are used to hold the metal frames |
takes only one person to move the frame |
hollow inside the filled like timber |
finished frame clean an good finish |
marking out an nailing the top to keep the trusses in place |
measuring out the purlins |
spacing out at 845 an nail into the top plate with 100x.4mm galv FH |
trusses sitting on top of top plate an ceiling battens. ceiling battens are nailed on to the trusses |
using a mark to make the marking owt easier |
extra experience
finished cleaning the ground layed down hardys (1.8x1.2) used cleats to hold them to ground |
removing the bath tub.taken jib away and broke down the box holding the shower |
old fasion house with a different bracing style. studs an nogs were cut to fit the diagonal brace inside.Studs were nailed in at 600mm centers |
the top of the original shower, mouldy from the badd shower an moisture cloggin up in the causing mould |
brick laying for the outside anwood frame inside fill with pink batts to prevent the damp moisture coming through |
sealed of taps after removing sink. turn off water pipe infront of teh house. double nogs for the sink to mount to. |
close up shot of the pipes being sealed off. |
shower before being removed |
mouldy ceiling |
sink before being removed |
type of gib use (2.4x1.2) 20mm thickness |
used hardys to lay on the floor so the tiles could go on |
underneath the shower.used plywood (2.4x1.2) measured to fit in the gap , added some cut off of 150x50 so the gib could sit on top |
Tuesday, 17 May 2011
flooring continued
half of the house is now floored carrying on from yesterday worked with the plywood
Sunday, 15 May 2011
floor
started off with the normal tool box talk discussing safety issues, then had to install girt cleats which held the joist and bearers together as seen in the picture to the left. After that we layed owt some sisalation foil for the insulation under the floor boards we the stable gun to hold the foil down an carefully spaced out the foil so it sagged into the gaps allowing for any wet liquid will slide an go through the wholes in the foil, after the foil was laid out, we nailed the floorboards down(particle board) an used decking nails to keep it in place, we then continued the same process till the end of class :)
Monday, 9 May 2011
today an yesterday
yesterday -finished off the nogging using 190x45 msg8 timber,shot a stringline from one end to the other end so we could nog in a straight line.wee den used the clamps so it tighten the the grip between the joist so we could put a nog in with out having gaps in between. started helping the others by cutting nogs for them, most of my cuts were good..jus was given wrong measurements so i swaped around with micheal to take down the measurement, then marty told us to move the bearer cause it was off so we used the sabre saw to cut the nails from the joist an bearer,we then cut five more post to go dwn as piles to replace the wuns on the sole plate.the bearer moving was a success,
today -carried on from yesterday with the nogging,marty told me o fix up the straightness of the timber that some of the boys did,so i used my dougy to pull out the nails.after that i used some wedges to bringing upp the timer so it was leveled with the plate covering the subfloor,after that i planed down the wuns overlapping the edge.after that i helped owt richards side an fixed all there mistakes :)
today -carried on from yesterday with the nogging,marty told me o fix up the straightness of the timber that some of the boys did,so i used my dougy to pull out the nails.after that i used some wedges to bringing upp the timer so it was leveled with the plate covering the subfloor,after that i planed down the wuns overlapping the edge.after that i helped owt richards side an fixed all there mistakes :)
Monday, 2 May 2011
back to work
worked with a couple of the boys on the house we organised the diffent type of treated timber like H3.2 an H1.2...these types of treated timber act to prevent the timber frm being rotted out.we placed the green timber H3.2 in the wet areas of the house example kitchen, bathroom an toilets..
Thursday, 21 April 2011
hard work
flipin hardwork to get onto construction sites with out a sitesafe id, but alguds in the end found work building benches was good enough..assignment is slowly killing my holidays lol
Tuesday, 12 April 2011
new beginnings
siope having a feel for the drop saw
team richard mucking around
bearers getting laminated with nails
after the previous day of cleaning up we got straight into today. the work load was shared for abit till team Marty suddenly changed our working pace from profiling to laminating and putting our bearers up. kept learning new stuff an occasionally shared some knowledge to the boys about skilled saws an drop saws. day was good cant wait to finsh the house.
team richard mucking around
bearers getting laminated with nails
after the previous day of cleaning up we got straight into today. the work load was shared for abit till team Marty suddenly changed our working pace from profiling to laminating and putting our bearers up. kept learning new stuff an occasionally shared some knowledge to the boys about skilled saws an drop saws. day was good cant wait to finsh the house.
Subscribe to:
Posts (Atom)