started off with the normal tool box talk discussing safety issues, then had to install girt cleats which held the joist and bearers together as seen in the picture to the left. After that we layed owt some sisalation foil for the insulation under the floor boards we the stable gun to hold the foil down an carefully spaced out the foil so it sagged into the gaps allowing for any wet liquid will slide an go through the wholes in the foil, after the foil was laid out, we nailed the floorboards down(particle board) an used decking nails to keep it in place, we then continued the same process till the end of class :)