Tuesday, 7 June 2011

extra experience

finished cleaning the ground layed down hardys (1.8x1.2) used cleats to hold them to ground
removing the bath tub.taken jib away and broke down the box holding the shower

old fasion house with a different bracing style. studs an nogs were cut to fit the diagonal brace inside.Studs were nailed in at 600mm centers

the top of the original shower, mouldy from the badd shower an moisture cloggin up in the causing mould

brick laying for the outside anwood frame inside fill with pink batts to prevent the damp moisture coming through

sealed of taps after removing sink. turn off water pipe infront of teh house. double nogs for the sink to mount to.

close up shot of the pipes being sealed off.

shower before being removed

mouldy ceiling

sink before being removed


type of gib use (2.4x1.2) 20mm thickness

used hardys to lay on the floor so the tiles could go on

underneath the shower.used plywood (2.4x1.2) measured to fit in the gap , added some cut off of 150x50 so the gib could sit on top

No comments:

Post a Comment