finished cleaning the ground layed down hardys (1.8x1.2) used cleats to hold them to ground |
removing the bath tub.taken jib away and broke down the box holding the shower |
old fasion house with a different bracing style. studs an nogs were cut to fit the diagonal brace inside.Studs were nailed in at 600mm centers |
the top of the original shower, mouldy from the badd shower an moisture cloggin up in the causing mould |
brick laying for the outside anwood frame inside fill with pink batts to prevent the damp moisture coming through |
sealed of taps after removing sink. turn off water pipe infront of teh house. double nogs for the sink to mount to. |
close up shot of the pipes being sealed off. |
shower before being removed |
mouldy ceiling |
sink before being removed |
type of gib use (2.4x1.2) 20mm thickness |
used hardys to lay on the floor so the tiles could go on |
underneath the shower.used plywood (2.4x1.2) measured to fit in the gap , added some cut off of 150x50 so the gib could sit on top |